               The comprehensive Kabini Reservoir Project Comprises of :

a)        A Reservoir across River Kabini near Bidarahally and Beechana halli in Heggadadevanakote Taluk, Mysore District with canals on both the banks.   
b)       A reservoir across Bandigadu stream near Sagaredoddakere in Heggadadevanakote taluk with canals on both the banks.
c)       A reservoir across river Nugu upstream of the existing Nugu Dam with Right Bank High Level Canal.
d)       Lifting arrangement for lifting 28.00 TMC of water in 4 monsoon months from the foreshore of Kabini Dam to the
combined system of Sagaredoddakere and  Upper Nugu Dams.
      
The information under different items for all the three components viz., a) b) and c) above are furnished separately.  The technical details in respect of (d) is also appended.

(i)   1 (a) Reservoir Projects:  
1.  Name of Reservoir  Kabini Reservoir
2.  Location    Located across River Kabini near villageBeechanahally

Latitude

11o  50' 30" N

  Longitude

 76o  20' 17" E
Taluk  Heggadadevanakote
District  Mysore
Sub-basin  C-2 Kabini Sub-basin
3.  Catchment area (in sq.kms)    2141.90
4.  Design yield at 50% dependability (in TMC) 97.70
5.  Storage (in TMC)  
        i) Gross  19.52
       ii)  Dead  3.52
      iii)  Live        16.00
      iv) Carry over       -NIL-

6.  Reservoir Evaporation   Losses (TMC)                   

  3.40
7.  i)  Filling period    From June to November
     ii) Depletion period     From  November to May
8.      Submersion (in acres) Karnataka                Kerala

         Total Area

15820                      140.84
         i)    Forest area 6950
         ii)   Cultivable area  8,870
        iii)  Fallow lands    Nil
        iv)  No.of villages / hamlets   22 villages / 14 hamlets
9.  Level Of Storage  
     i) Full Reservoir Level (FRL)  RL 2,284.00 ft.
     ii) Minimum drawn down  level (MDDL)   RL 2,266 for Right Bank Canal
  RL 2,256 for Left Bank Canal
    iii)  Dead Storage Level  RL 2,249.00 ft.
    iv) Sill level of canal sluice  RL 2,249.00 ft.
           a) Right Bank Canal Sluice  RL 2,249.00 ft.
           b) Left Bank Canal Sluice RL 2,249.00 ft.
    v) Sill level of river sluice RL 2,219.00 ft.
10.  Silt charge per year (Mcft/sq.km of catchment area)    
  i)    Designed    0.0001
  ii)   Actual    Not assessed
11.  Ayacut (in acres) Flow Canals                Lift Canals  
        i)     Left Bank Canal    3,000                                  -
        ii)    Right Bank Canal  1,10,000                      1,04,200
12.  General characteristics of soil  in the Command Area   In the upper reaches of both Right Bank Canal and Left Bank Canal Red Soil is predominant while black soil are more predominant in its lower reaches.
13.  a) Installed power in MW 32 M.W. Contemplated.
       b) Annual Power Generation   in MU   280.32
  (2) a) Reservoir Project:    
  1. Name of Reservoir     Sagaredoddakere
  2. Location   Located across Bandigadu stream near  village Hullamala.
Latitude 11o  55' 42" N
Longitude  76o  22' 48" E
Taluk  Heggadadevanakote
District Mysore
Sub-basin     C-2 Kabini Sub-basin
3.  Catchment area (in sq.kms)  21.66
4.  Design yield     (in TMC)  1.00 TMC 
In addition 28 TMC to be lifted in 4 monsoon months from Kabini Reservoir to the combined Upper Nugu and Sagaredoddakere Reservoir.
5.  Storage (in TMC) 
  i)   Gross 10.900
  ii)  Dead    1.000
  iii) Live  9.900
  iv) Carry over   -NIL-
6.  Reservoir Evaporation   Losses (TMC)  Combined evaporation loss of Sagaredoddakere and Upper Nugu is 2.00 TMC
7.  i)  Filling period   From July to October
    ii) Depletion period   From  November to June
8.       Submersion (in acres)     4,953
  i)    Forest area 1,981.00
  ii)   Cultivable area      -
  iii)  Fallow lands   2,972.00
  iv)  No.of villages / hamlets    8
9.Level Of Storage
i) Full Reservoir Level (FRL)  RL 2,472.00 ft.
ii) Minimum drawn down level (MDDL)      RL 2,404.00 ft.
iii)  Dead Storage Level   RL 2,400.00 ft.
iv) Sill level of canal sluice  RL 2,400.00 ft.
       a) Right Bank Canal Sluice  RL 2,400.00 ft.
       b) Left Bank Canal Sluice RL 2,400.00 ft.
v) Sill level of river sluice   No river sluice
10.  Silt charge per year (Mcft/sq.km of catchment area)    
  i)    Designed    0.0001
  ii)   Actual    Not assessed
11.  Ayacut (in acres)        
i)     Left Bank Canal   1,200          }  4,200   
ii)    Right Bank Canal    3,000          } 
12.  General characteristics of soil  in the Command Area        In the upper reaches of both Red Soil is predominant while black soil is met with in lower reaches.
13.  a) Installed power in MW -Nil-
       b) Annual Power Generation  -Nil-
  3  a) Reservoir Project :  
1.Name of Reservoir Upper Nugu
2.Location   Located across River Nugu near Sambegowdanahalli.
Latitude  11o  54’ 28” N
Longitude 76o  26’  00” E
Taluk  Heggadadevanakote
District  Mysore
Sub-basin  C-2 Kabini Sub-basin
3.  Catchment area (in sq.kms)  308.00
4.  Design yield     (in TMC)   7.925 TMC 
In addition to it 28 TMC of water to be lifted in 4 monsoon months from Kabini Reservoir to the combined Upper Nugu and Sagaredoddakere.
5.      Storage (in TMC)       
i)  Gross  9.841
ii)  Dead  0.088
iii) Live   9.753
iv) Carry over   -NIL-
6.  Reservoir Evaporation  Losses (TMC)  Combined evaporation loss of Upper Nugu and Sagaredoddakere Reservoir is 2.00 TMC
7.  i)  Filling period    From July to October
     ii) Depletion period From  November to June
8.  Submersion (in acres)   8,018
i)    Forest area      3,207
ii)   Cultivable area   -
iii)  Fallow lands   4,811
iv)  No.of villages / hamlets   19
9.  Level Of Storages   
i)Full Reservoir Level (FRL)  :  RL 2,472.00 ft.
ii) Minimum drawn down level (MDDL)   RL 2,415.00 ft.
iii)  Dead Storage Level  RL 2,400.00 ft.
iv) Sill level of canal sluice       
     a) Right Bank Canal Sluice RL 2,400.00 ft.
     b) Left Bank Canal Sluice  No Left Bank Canal
v) Sill level of river sluice   No river sluice
10.  Silt charge per year (Mcft/sq.km of catchment area)    
i)   Designed  0.0001
ii)   Actual  Not assessed
11. Ayacut (in acres)    
i)     Left Bank Canal   No Left Bank Canal   
ii)    Right Bank Canal  1,00,000
12.  General characteristics of soil  Red soil is seen in Upper reaches while in the Command Area  B.C. soil is predominant  in lower reaches.
13.  a) Installed power in MW  No power generation
       b) Annual Power Generationin MU -Nil-
II.          (b) Particulars of Dam KABINI DAM
1. Type of Dam  Masonry gravity dam with overflow and non over flow sections with earthen flanks on either side.
2. Length of Dam (in ft)    8,965 ft.
3. Height of dam (in ft)  above River Bed Level   95 ft.
4. Length of spillway   265 ft.
5. Capacity of spillway     1,94,150 Cusecs  4 Radial gates of 40' x 40'
6. Outlets (Canals & Rivers)   LBC                        RBC                 River sluice
  a) Number       2                                5                           3
  b) Type     Vertical gates of   Vertical gates of  Vertical  gates of
  c) Size   8' x 5'                     8' x 10'                8' x 14'
  d) Capacity (Cusecs)        99                      2.582                   17,890
II.         (b) Particulars of Dam                      : SAGARE DODDAKERE RESERVOIR  
  1. Type of Dam  Earthen Dam with Left Bank spillway
  2. Length of Dam (in ft)  12,927 ft.
  3. Height of dam (in ft)   166 ft. above River Bed Level
  4. Length of spillway  250 ft.
  5. Capacity of spillway Ungated spillway   
  6. Outlets (Canals & Rivers)     LBC         RBC    RIVER SLUICE
      a) Number     -Not yet finalised –
      b) Type  -Not yet finalised -
      c) Capacity (Cusecs)     10                 25                  -
II.        (b) Particulars of Dam   UPPER NUGU RESERVOIR  
  1. Type of Dam    Masonry dam with non-over flow and over-flow section.
  2. Length of Dam (in ft)  5,280 ft.
  3. Height of dam (in ft)  125 ft.above River Bed Level
  4. Length of spillway    2,445 ft.
  5. Capacity of spillway    1,46,000 Cusecs 3 vertical  gates of 40' x 26'
  6. Outlets (Canals & Rivers)   LBC            RBC         River sluice
  a) Number   -Not yet finalised -
  b) Type -Not yet finalised -
  c) Capacity (Cusecs)  1,350
II. (iii) DESCRIPTION OF CANALS  
  (Main & Branch Canals)     KABINI PROJECT
1. i) Length of LBC (in Kms)   26.20 Kms.
   ii) Length of RBC (in Kms)       202.00 Kms.
2. i)  Length of Branch Canal under LBC   -Nil-
   ii) Length of Branch Canal under RBC  30.00 kms.
3. Whether perennial / One Seasonal / Two Seasonal  Two seasonal
4. Whether Lined or Unlined
   a) Left Bank Canal    Partially lined (in vulnerable reaches)
5. Authorised Capacity      LBC     -                99.00
  RBC    -           2,582.00
II (iii) Details of Sagaredoddakere and Upper Nugu:
    (i)                  Canal from Sagaredoddakere:
1.  i) Length of LBC (in kms)   9
     ii) Length of RBC (in kms)   16
2.  i) Length of Branch Canal under LBC -Nil-
     ii) Length of Branch Canal under RBC -Nil-
3.    Whether Perennial / One seasonal /  Two seasonal Two Seasonal
4.    Whether Lined or Unlined Unlined
5.    Authorised Head Capacity (Cusecs)  LBC 10
RBC 25
(ii)            Canl from Upper Nugu:
1.     i) Length of LBC (in kms)     No Left Bank Canal
        ii) Length of RBC (in kms)     258.00
2.     i) Length of Branch Canal under LBC :  -
        ii) Length of Branch Canal under RBC   -
3.      Whether Perennial / One seasonal /  Two seasonal Perennial
4.     Whether Lined or Unlined   Unlined
5.     Authorised Head Capacity (Cusecs)  1.350

I.                    I.  Lifiting water from Foreshore of Kabini Reservoir to Sagaredoddakere and Upper Nugu (Combined ) Reservoirs.

1.      F.R.L. of Kabini Reservoir     696.16 m (2284.00 feet)
2.      R.L. of proposed Lift Point  690.37 m (2265.00 feet)
3.      Diameter of Raising main 3.00 m (10 feet)
4.      Number of rows of raising main  7 Nos.
5.      Length of Raising main    762 m (2500 feet)
6.      Total height of lift  64.62 m (212 feet)
7.      Height of Lift upto pressure tunnel   32.00 m (105 feet)
8.      Diameter of pressure tunnel  5.00 m
9.      Capacity of tunnel  78.00 cumecs (2750 C/s)
10.  Quantity of water to be lifted at the rate of  7 TMC / month) 200 m.cum/month. 800 m.cum (28 TMcft)
11.  Total HP required   1,20,000 HP (including standby)
12.  Length of Pumps provided   3.40 Km
13.  Number of pumps provided  60 Nos. of 2000 HP each
14.  Annual maintenance charges / acre Rs. 470/- per acre
15.  Total cost of the Lift Scheme   Rs. 250.00 Crores.