Introduction

Organisation  Structure

River Systems in Karnataka

Irrigation in Karnataka

Projects

Notifications & Govt. Orders

Tender Notifications & Post tender Evaluation

Archives

Home

1.  Name of the project

Karanja

2.  Location

Near Byalhalli in Bhalki Taluk in Bidar District

3.  Basin/Sub-Basin

Godavari / Manjra

4.  Allocation

13.1 TMC

5.  Utilisation

9.270  TMC

6.  Catchment area

2025 Sq Kms

7.  Yield

9.591 TMC

8.  Gross Storage

7.691 TMC

9.  Live Storage

7.316 TMC

10.Dead Storage

 0.374 TMC

11.Details of Dam

     a. Length of Dam 3480 M
     b. Type Composite da

12.Tank Bund Level

589.15 M

13. Full Reservoir Level

584.15 M

14.Maximum Water Level

587.00 M

15.Crest Level

574.15 M

16.Cill Level

575.15 M

17.Canal Bed Level

575.15 M

18.Spillway Discharge

469000 Cusecs Routed to 250000 Cusecs

19.Spillway  Gates 6 Nos. ( 15 M x  10 M)

20.Submergence

     a. Area 5673 Ha
     b. Villages 9 Villages ( 7 Full and 2 Partial)
     c. Population 9080

21.Left Bank Canal

     a. Length

31 Kms
     b. Head Discharge 70 Cusecs
     c. Atchkat 3238 Ha

22.Right Bank Canal

     a. Length 131 Km
     b. Head Discharge 598 Cusecs
     c. Atchkat 28329 Ha

23.Fore Shore Lift Canal

     a. Length 24 Km
     b. Head Discharge 62 Cusecs
     c. Atchkat 4047 Ha

24.Gross Command

48968 Ha

25.Net Command

35614 Ha

26.Cropping pattern

     a. Khariff 33630 Ha
     b. Rabi 13598 Ha
     c .Bi-seasonal 1740  Ha

Top